LCQ14: Impact of the concrete batching plant in Tsuen Wan on nearby residents
***************************************************************
Following is a question by the Hon Kwok Fu-yung and a written reply by the Acting Secretary for Development, Mr David Lam, in the Legislative Council today (November 25):
Question:
Some members of the public have relayed that a concrete batching plant (the CBP) in operation on Kwok Shui Road, Tsuen Wan has led to frequent movement of large vehicles in the vicinity, aggravating traffic congestion in the district and posing a risk to road safety, while also affecting the environmental hygiene of the surrounding areas. On the other hand, the Government plans to develop public housing on a site near the CBP (namely the original site of the ex-Kwai Chung Public School premises), with completion expected in 2030-2031. In this connection, will the Government inform this Council:
(1) of the current number of CBPs still in operation across Hong Kong, their locations, the land leases or lease periods concerned, as well as the expiry dates of the Specified Process Licences issued by the Environmental Protection Department under the Air Pollution Control Ordinance;
(2) of the respective powers and responsibilities of the relevant departments when the Government vets and approves application for renewal of licences for CBPs at present; and apart from the relevant pollution control regulations, how the Government assesses the impact of their operations on nearby traffic safety and environmental hygiene;
(3) whether it will consider formulating measures or providing incentives, such as tightening the conditions for renewal of licences or adopting the approach of land exchange, to encourage CBPs to relocate away from densely populated districts;
(4) whether, before deciding to develop public housing on the above site, it has conducted environmental and traffic impact assessments on the CBP to ascertain the impact of its operations on the newly moved-in residents in the future; if so, of the details; if not, the reasons for that; and
(5) if the CBP remains in operation after the intake of the above public housing, what mitigation measures will be adopted to reduce its impact on environmental hygiene and traffic in the district?
Reply:
President,
Concrete is extensively used in construction projects in Hong Kong and reliable concrete supply is very important. As freshly mixed concrete will harden shortly, it must be delivered in a timely manner to construction sites in various regions. Otherwise, the quality of concrete may be affected. Therefore, the locations of concrete batching plants (CBPs) entail a geographical consideration. A number of CBPs have been set up in various regions over the territory to supply concrete for the construction projects in nearby areas. All CBPs must obtain a Specified Process Licence (SPL) issued by the Environmental Protection Department (EPD), and their operations are also subject to regulation under other applicable environmental legislation, to ensure no environmental nuisance would be caused to nearby residents during operation.
Upon consulting the Environment and Ecology Bureau and the Housing Bureau, our consolidated reply to the various parts of question is as follows:
(1) Currently, there are a total of 29 CBPs in Hong Kong that hold the SPLs issued by the EPD, located across nine districts in Hong Kong. The expiry dates of the relevant licences, together with details of their private land lease or government land tenancy terms, are set out in the Annex (including the CBP in Tsuen Wan District referred to in the question).
(2) The EPD's SPL aims to control the emissions of air pollutants from CBPs during operation. The EPD examines and approves applications for the SPLs and their renewals in accordance with the Air Pollution Control Ordinance (Cap. 311) to stipulate licensing conditions. This includes requiring the licence holder to use the best practicable means at all times to prevent air pollutant emissions, avoid inhibiting the attainment or maintenance of air quality objectives, and prevent noxious or offensive emissions or nuisances. In addition, the EPD will consider whether the applicant can clearly demonstrate its capability to provide, install and effectively operate the required dust control measures, and whether enhanced air pollution control measures such as installing additional monitoring systems at the plant to step up surveillance of polluting processes or plants are necessary to ensure the attainment or maintenance of the air quality objectives.
A CBP that has been granted a licence by the EPD must strictly comply with the licence conditions, including properly operating and strictly implementing all air pollution control measures. The EPD will conduct inspections at the CBP from time to time to ensure that the CBP operates in accordance with the licence conditions.
As mentioned above, apart from the SPL, the operation of CBPs is regulated by other environmental legislation, including the requirement to comply with the Noise Control Ordinance and the Water Pollution Control Ordinance, operate properly, and not cause excessive dust emissions or noise, or illegally discharge wastewater. If any non-compliance with the relevant environmental legislation or requirements is found, the EPD will take appropriate enforcement action.
(3) From a land use planning perspective, a CBP can be operated within "Industrial" zones with planning permission. To encourage the transformation of the traditional industrial area at Kwok Shui Road into a residential neighbourhood through redevelopment or conversion to residential use on application to the Town Planning Board to gradually phase out existing industrial uses, the Town Planning Board approved the rezoning of the area covering the subject CBP and adjoining industrial buildings (about 3.83 hectares) from "Industrial" to "Residential (Group E)" about 20 years ago.
Since the subject CBP is an industrial use that existed before the rezoning, it is tolerated and allowed to continue to exist, but new industrial development will not be permitted by the Planning Department on the site in order to avoid incompatibility between industrial and residential uses. At present, the industrial uses around Kwok Shui Road have already made gradual transformation into non-polluting industries, businesses and residential uses. These include two industrial sites which have been redeveloped into residential developments in 2010 and 2014 (namely Primrose Hill and The Rise).
In fact, in 2011, the Town Planning Board granted planning permission to the lot owner of the subject CBP site for residential development. Subsequently, the Buildings Department (BD) approved the building plans for residential developments in 2016 and 2024 respectively. In other words, the lot owner can now redevelop the site in accordance with the building plans as approved by the BD. However, as the site is under private ownership, whether the proposed development would be implemented and the implementation timetable would be subject to the commercial decision of the lot owner.
(4) and (5) The public housing site at Kwok Shui Road was previously a school site (i.e. the original site of the former Kwai Chung Public School). Prior to the Government's proposal to rezone the site of the former Kwai Chung Public School for public housing development, the Civil Engineering and Development Department (CEDD) had completed relevant feasibility study for the development in 2021, among which, the Environmental Review (ER) and Traffic Impact Assessment (TIA) included the examination of the environmental and traffic impacts of the CBP on the future residents. The findings of the ER demonstrated that the CBP would not have adverse environmental impact on the public housing development. According to the recommendations in the TIA, the CEDD will widen a section of Kwok Shui Road from its existing width of about 7.3 metres to about 9.5 m to ensure sufficient space for two-way traffic by vehicles, even when there are vehicles temporarily parking on that road segment. The TIA also showed that, upon completion of the said road improvement works, the road network in the vicinity can accommodate the traffic and transport needs arising from the development. The overall findings of the feasibility study indicated that, with the provision of appropriate mitigation measures, the proposed public housing development is technically feasible, and will not generate insurmountable environmental (including air quality and noise) and traffic impacts. When approving the rezoning proposal from "Government, Institution or Community" to "Residential (Group A) 21" in 2022, the Town Planning Board already gave full consideration to the relevant impact assessments.
Ends/Wednesday, November 25, 2026