Construction output for second quarter of 2025
**********************************************

     The total gross value of construction works (GVCW) performed by main contractors in the second quarter of 2025 remained virtually unchanged in nominal terms compared to the same period a year earlier, standing at $68.9 billion, according to the provisional results of the Quarterly Survey of Construction Output released today (September 11) by the Census and Statistics Department (C&SD).
 
     After discounting the effect of price changes, the provisional results showed that the total GVCW performed by main contractors decreased by 3.5% in real terms over the same period. GVCW in real terms is derived by deflating the corresponding nominal value with an appropriate price index to the price level in the base period of 2000.
 
     Analysed by type of construction works, the GVCW performed at private sector sites totalled $17.2 billion in the second quarter of 2025, down by 18.6% in nominal terms over a year earlier. In real terms, it decreased by 20.9%. The GVCW performed at public sector sites increased by 15.0% in nominal terms over a year earlier to $31.2 billion in the second quarter of 2025. In real terms, it increased by 11.6%.
 
     The GVCW performed by main contractors at locations other than construction sites amounted to $20.5 billion in the second quarter of 2025, slightly down by 0.7% in nominal terms compared with a year earlier. In real terms, it decreased by 3.6%.  Construction works at locations other than construction sites included minor new construction activities and decoration, repair and maintenance for buildings; and electrical equipment installation and maintenance works at locations other than construction sites.
 
     Analysed by major end-use group, the GVCW performed at construction sites in respect of residential buildings projects amounted to $21.3 billion in the second quarter of 2025, up by 3.2% in nominal terms over a year earlier. Over the same period, the GVCW performed at construction sites in respect of transport projects down by 16.5% in nominal terms to $8.1 billion in the second quarter of 2025.
 
     On a seasonally adjusted quarter-to-quarter basis, the GVCW performed by main contractors decreased by 2.9% in nominal terms and 3.6% in real terms in the second quarter of 2025 compared with the first quarter of 2025.
 
     Table 1 shows the provisional figures on the GVCW performed by main contractors in the second quarter of 2025. Table 2 shows the revised figures for the first quarter of 2025.
 
     Owing to the widespread sub-contracting practices in the construction industry, a construction establishment can be a main contractor for one contract and a sub-contractor for another contract at the same time. The GVCW performed by main contractors covers only those projects in which the construction establishment takes the role of a main contractor, but not projects in which it takes only the role of a sub-contractor. However, sub-contractors' contribution to projects should have been included in the GVCW performed by main contractors for whom they worked.
 
     The classification of construction establishments follows the Hong Kong Standard Industrial Classification Version 2.0, which is used in various economic surveys for classifying economic units into different industry classes.
 
     More detailed statistics are given in the "Report on the Quarterly Survey of Construction Output". Users can browse and download this publication at the website of the C&SD (www.censtatd.gov.hk/en/EIndexbySubject.html?pcode=B1090002&scode=330).
 
     For enquiries about the survey results, please contact the Construction and Miscellaneous Services Statistics Section of the C&SD (Tel: 3903 6965; email: building@censtatd.gov.hk).

Ends/Thursday, September 11, 2025
Issued at HKT 16:30

NNNN