The Environmental Protection Department (EPD) today (July 24) released a list of environmental impact assessment (EIA) reports for major development projects approved between April 1, 2003 and June 30, 2003.

Statutory EIA reports

---------------------

1 Tung Chung - Ngong Ping Cable Car Project - EIA

(Territory Development Department)

2 Cement Silos Addition Work in Tai Po Cement Depot -

EIA

(K. Wah Materials Limited)

3 Upgrading and Expansion of San Wai Sewage Treatment

Works and Expansion of Ha Tsuen Pumping Station -

EIA

(Drainage Services Department)

4 Proposed Submarine Gas Pipelines from Cheng Tou Jiao

Liquefied Natural Gas Receiving Terminal, Shenzhen

to Tai Po Gas Production Plant, Hong Kong - EIA

(The Hong Kong and China Gas Company Limited)

For non-statutory studies, the environmental assessment (EA) for the following projects were also completed.

1 Stage II Study on Review of Metroplan and the

Related Kowloon Density Study Review

(Planning Department)

2 Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai

Drainage Package Stage I - EA

(Drainage Services Department)

3 Preliminary Feasibility Study on Provision of Cycle

Track and Related Development Facilities between

Tuen Mun and Tsuen Wan - EA

(Territory Development Department)

The reports and executive summaries of approved statutory EIAs are available at the following locations:

(a) Environmental Impact Assessment Ordinance (EIAO)

Register Office, EPD, 27th floor, Southorn Centre,

130 Hennessy Road, Wan Chai;

(b) Wan Chai Environmental Resource Centre, 221 Queen's

Road East, Wan Chai;

(c) Tsuen Wan Environmental Resource Centre, Tak Wah

Park, Tak Wah Street, Tsuen Wan;

(d) Public Enquiry Centre of relevant District

Office(s); and

(e) EIAO website - http://www.epd.gov.hk/eia.

In addition, a list of EIA study briefs issued under the EIAO and ongoing non-statutory EA studies is also available at the EPD's EIAO Register Office and environmental resource centres for public inspection.

They include:

I. Statutory Studies

------------------

1 Reclamation of Sai Wan Typhoon Shelter and

Associated Engineering Works at Cheung Chau - EIA

(Territory Development Department)

2 Remaining Development in Tung Chung and Tai Ho -

Comprehensive Feasibility Study - EIA

(Territory Development Department)

3 Siu Ho Wan Water Treatment Works Extension - EIA

(Water Supplies Department)

4 Road P1 Advance Works at Yam O on Lantau Island

(Civil Engineering Department)

5 Peng Chau Helipad - EIA

(Civil Engineering Department)

6 Peng Chau Sewage Treatment Works Upgrade - EIA

(Drainage Services Department)

7 New Contaminated Mud Marine Disposal Facility at

Airport East/East Sha Chau - EIA

(Civil Engineering Department)

8 Drainage Improvements in Southern Lantau - EIA

(Drainage Services Department)

9 Flyover at Junction of Che Kung Miu Road/Hung Mui

Kuk Road - EIA

(Highways Department)

10 Proposed Shuen Wan Landfill Golf Course - EIA

(Home Affairs Bureau)

11 Widening of T6 Bridge, Sha Tin - EIA

(Highways Department)

12 Widening of Tate's Cairn Highway between Shek Mun

Interchange and T6 Interchange - EIA

(Highways Department)

13 Tai Po Sewage Treatment Works and Sewerage - EIA

(Drainage Services Department)

14 Planning and Development Study on North East New

Territories - EIA

(Territory Development Department)

15 Drainage Improvement in Sha Tin and Tai Po - EIA

(Drainage Services Department)

16 Trunk Road T4 in Sha Tin - EIA

(Territory Development Department)

17 Drainage Improvement in the Northern New Territories

- Package C - EIA

(Drainage Services Department)

18 Tseung Kwan O Development Contract No. TK 44/97:

Dualling of Hang Hau Road - EIA

(Territory Development Department)

19 Tseung Kwan O Development Phase 3 - Road P2

connecting Town Centre and Western Coast Road - EIA

(Civil Engineering Department)

20 Proposed Extension of Public Golf Course of Kau Sai

Chau, Sai Kung - EIA

(The Hong Kong Jockey Club)

21 Sai Kung Sewage Treatment Works, Phase II Upgrading

- EIA

(Drainage Services Department)

22 Drainage Improvements in Sai Kung - EIA

(Drainage Services Department)

23 Road Widening of Hing Wah Street - EIA

(Highways Department)

24 Drainage Improvement in Tsuen Wan, Kwai Chung and

Tsing Yi, Tsuen Wan Drainage Tunnel - EIA

(Drainage Services Department)

25 Widening of Yeung Uk Road between Tai Ho Road and Ma

Tau Pa Road, Tsuen Wan - EIA

(Territory Development Department)

26 Extension of Kwai Chung Crematorium

(Architectural Service Department)

27 Shatin to Central Link - EIA

(Kowloon-Canton Railway Corporation)

28 Animal Cremator - EIA

(Environmental Protection Department)

29 Route 10 (North Lantau to Yuen Long Highway)

Northern Section - EIA

(Highways Department)

30 Feasibility Study of Waste-to-Energy Incineration

Facilities - EIA

(Environmental Protection Department)

31 Planning and Development Study of Potential Housing

Site near Area 1 (San Wai Court), Tuen Mun - EIA

(Territory Development Department)

32 Planning and Development Study on North West New

Territories - EIA

(Territory Development Department)

33 Upgrading of Pillar Point Sewage Treatment Works -

EIA

(Drainage Services Department)

34 Recovery Park in Tuen Mun Area 38 - EIA

(Environmental Protection Department)

35 Lau Fau Shan Development - Package 4 - EIA

(Territory Development Department)

36 Proposed Development at Fung Lok Wai, Yuen Long at

Lot 1457 R.P. in DD123 - EIA

(Mutual Luck Investment Limited)

37 Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai

Drainage Package Stage 1 - EIA

(Drainage Services Department)

38 San Tin Western Main Drainage Channel - EIA

(Drainage Services Department)

39 Yuen Long and Kam Tin Sewerage and Sewage Disposal

Stage 2 - EIA

(Drainage Services Department)

40 Lau Fau Shan Development - Remaining Engineering

Works Phase 1 - Hang Hau Tsuen Channel and

Associated Works - EIA

(Territory Development Department)

41 Improvement to San Tin Interchange - EIA

(Highways Department)

42 Proposed Road A connecting Sin Fat Road and Cha Kwo

Ling Road at Cha Kwo Ling, Kwun Tong - EIA

(Civil Engineering Department)

43 Central Kowloon Route - EIA

(Highways Department)

44 Kowloon Southern Link - EIA

(Kowloon Canton Railways Corporations)

45 South East Kowloon Development - Kai Tak Approach

Channel Reclamation - EIA

(Territory Development Department)

46 Distributor Roads under Agreement No. CE 42/2000

South East Kowloon Development, Infrastructure at

North Apron Area of Kai Tak Airport, Design and

Construction - EIA

(Territory Development Department)

47 Reprovisioning of Diamond Hill Crematorium - EIA

(Architectural Services Department)

48 Outlying Island Sewerage Stage 1 Phase 2, Package J

- Sok Kwu Wan Sewage Collection, Treatment and

Disposal (previously known as Outlying Island

Sewerage Stage 1 Phase 2 Sok Kwu Wan Sewage

Treatment Works and Submarine Outfall) - EIA

(Drainage Services Department)

49 Helipad at Yung Shue Wan, Lamma Island - EIA

(Civil Engineering Department)

50 Drainage Improvement in Northern Hong Kong Island -

Hong Kong West Drainage Tunnel- EIA

(Drainage Services Department)

51 Western Harbour Submarine Pipeline and Associated

Stations - EIA

(The Hong Kong China Gas Company Limited)

52 Aberdeen, Ap Lei Chau and Pok Fu Lam Sewerage and

Sewage Disposal Stage II - EIA

(Drainage Services Department)

53 Tonggu Channel of Shenzhen Port

(Shenzhen Port Tonggu Channel Developing Office)

54 Tsuen Wan Road Upgrading - EIA

(Territory Development Department)

II. Non-statutory Studies

-----------------------

1 Dualling of Clear Water Bay Road between Tai Po Tsai

and Hang Hau Road

(Highways Department)

2 Development of an Integrated Arts, Cultural and

Entertainment District of at the West Kowloon

Reclamation, Hong Kong

(Housing, Planning and Lands Bureau)

3 Focus Study on the Early Development of the Proposed

Tourism Node Incorporating a Cruise Terminal within

the South East Kowloon Area

(Territory Development Department)

4 Planning and Engineering Feasibility Study for North

of Pamela Youde Hospital, Chai Wan

(Civil Engineering Department)

5 Feasibility Study for Development at Cha Kwo Ling

Kaolin Mine Site

(Civil Engineering Department)

6 Urban Design Study for the Planning and Development

of Southeast Kowloon

(Planning Department)

7 Sunnyville Estate Development at Nam Sang Wai, Yuen

Long - EA

(Private Developer)

8 Yuen Long, Kam Tin Sewerage and Sewage Disposal

Stage I, Package 1A-1T and 1B-1T Kam Tin Trunk

Sewerage Phase I and II - EA

(Drainage Services Department)

9 Extension of Existing Landfills and Identification

of Potential New Waste Disposal Sites

(Environmental Protection Department)

10 Strategic Environmental Assessment for Territory-

wide Implementation Study for Water-cooled Air

conditioning Systems in Hong Kong

(Electrical and Mechanical Services Department)

11 Strategic Environmental Assessment for Hong Kong

2030: Planning Vision and Strategy

(Planning Department)

12 Study on the Long-term Arrangements to Accommodate

Inert Construction and Demolition Materials and

Dredged Mud - Strategic Environmental Assessment

(Civil Engineering Department)

13 Investigation and Preliminary Design for

Reconstruction and Improvement of Tuen Mun Road - EA

(Highways Department)

Information related to the EIAO is also available at the EIAO website at http://www.epd.gov.hk/epd/eia.